Before gunite is introduced, the area is excavated to make the hole for the pool. Rebar reinforces the area and acts as a framework to hold the gunite.
The gunite is applied by spraying a hose filled with a cement, sand, and water mixture onto the rebar framework. It is then smoothed out and left to cure for a few days.
Once the gunite has cured, we apply a plaster in the color and texture you want to create the final surface needed before water fills the pool.